Set up Jira Cloud
Learn how to set up Jira Cloud and integrate it with other products and applications.
This page refers to the advanced planning features that are only available as part of Jira Cloud Premium and Enterprise.
If your schedule bars have a striped pattern that fades out in one direction, this indicates that a parent issue is using one set date and one date rolled-up from child issues. This is called a partial roll-up, and is demonstrated below:
If a parent issue’s schedule bar fades out completely, it means that one date can’t be inferred since a child issue doesn't have a start and end date assigned to them. Missing start or end dates prevent your plan from determining a roll-up date, and so the schedule bar fades out.
To fix a partial roll-up, ensure that all child issues have start and end dates.
Was this helpful?